The President of the Republic, Filipe Nyusi, recently inaugurated a water supply system at the Maluana Administrative Post, in the Manhiça district.
The system will benefit more than 3,000 inhabitants, but can feed up to 17,000 inhabitants at its maximum output, according to a statement from the Presidency.
After Maluana, according to the statement, Nyusi will go to the district of Boane to inaugurate another water supply system in Chitsavane, at the Matola-Rio Administrative Post.
The two infrastructures were built under the National Rural Water Supply and Sanitation Program (PRONASAR).
Leave a Reply